The yellow marker shows the proposed location of the Cell Tower. The photo also shows the close proximity to surrounding homes.

Friday, March 5, 2010

T-MOBILE'S SLEIGHTS OF HAND

Montgomery County law requires that the community's input be sought after a cell tower application is made. (Click this link to access Montgomery County Executive Regulation 14-96, and click this link to access MCPS Policy ECN, both establishing the requirement to reach out to the community and seek its input.)

In reaching out to the community, T-Mobile has employed a strategy of half truths and gamesmanship since it first presented its proposal to install a cell tower at Whitman High School.

1. In all of its documents distributed to the community (listed below), T-Mobile has consistently described the proposed 120-foot cell tower not as a cell tower but as a "lightpole:"
  • T-Mobile's October 2009 e-mail to the PTSA, which was published on the school's website (but now has been removed), states that T-Mobile is "interested in installing a 120' high lightpole." (Click this link to access a copy of the e-mail.)
  • T-Mobile's architectural drawing of the proposed cell tower's elevation, which was posted on the school's website in advance of the November 17, 2009 presentation (but now has been removed) is entitled "Light Pole Elevation." (Click this link to access the drawing.)
  • T-Mobile's fact sheet that was distributed at the November 17, 2009 presentation states that T-Mobile "proposes replacing an existing baseball field light with a new lightpole."  (Click this link to access the fact sheet.)
  • T-Mobile's January 4, 2010 letter to neighbors of Whitman High School states that "T-Mobile is working with the Montgomery County School system to replace a baseball field light with a new lightpole."  (Click this link to access the letter.)
  • T-Mobile's January 11, 2010 letter to neighbors of Whitman High School contains the identical statement: "T-Mobile is working with the Montgomery County School system to replace a baseball field light with a new lightpole."  (Click this link to access the letter.)
  • T-Mobile's January 19, 2010 letter to neighbors of Whitman High School also contains that statement: "T-Mobile is working with the Montgomery County School system to replace a baseball field light with a new lightpole." (Click this link to access the letter.)
  • T-Mobile's January 2010 fact sheet that was posted on the school website on January 29, 2010 refers to the proposed cell tower four times as a "light pole" or the "Whitman light pole." (Click this link to access the fact sheet.)
  • T-Mobile's February 23, 2010 letter to neighbors of Whitman High School, which was posted on the school website on February 25, 2010, states that "T-Mobile is working with the Montgomery County School system to replace an existing baseball field light with a new lightpole at Whitman High School."  (Click this link to access the letter.)
2. In its set of site plans and architectural drawings, T-Mobile presented a not-to-scale elevation of the proposed cell tower and thereby visually concealed the cell tower's true height. (Click this link to access T-Mobile's plans and drawings.)  The cell tower's true height can be appreciated on a to-scale drawing of the cell tower provided by a neighbor.  This drawing includes school buildings to show the height of the tower relative to the height of the buildings.  (Click this link to access the to scale drawing.)

3. In both balloon tests, T-Mobile's conduct prevented community members from observing those tests:
  • On November 7, 2009, T-Mobile ended its balloon test one hour before the announced time, claiming that the wind was too strong.  The announcement of the balloon test stated that T-Mobile would conduct its balloon test "on Saturday, November 7, between 8 and 11 AM (raindate, Sunday November 8, 8-11 AM)."  Yet, by 10 a.m., T-Mobile had taken down the balloon, preventing community members from observing the balloon test between 10 a.m. and 11 a.m.
  • On November 8, 2009, the raindate, T-Mobile did not conduct a balloon test, yet it was a beautiful, windless day.
  • On January 4, 2010, T-Mobile announced that it would conduct a second balloon test on January 10, 2010 from 7:30 a.m. to 8:30 a.m.  (Click this link to access T-Mobile's January 4, 2010 letter.)
  • On January 10, 2010, T-Mobile conducted its second balloon test, yet in the midst of doing so, T-Mobile suddenly moved the balloon to a different location, unannounced.  The new location was closer to Pyle Road and further away from Clearwood Road.  This prevented community members who had relied on T-Mobile's announcement from observing the balloon test at the proposed cell tower location during one half of the announced time frame.
4. In its balloon tests, T-Mobile misrepresented the true height of the proposed cell tower:
  • Throughout both of T-Mobile's balloon tests, strong wind caused the balloon to veer off significantly from the proposed cell tower site and to fly at a much lower altitude than 120 feet.
  • Moreover, when T-Mobile moved the balloon during its January 10, 2010 balloon test, it had the immediate effect of making the balloon look even lower than at the proposed location, when viewed from Clearwood Road.  Clearly, any photographs subsequently taken from Clearwood Road will show the balloon as flying lower than from its original location.  To view our videos and photographs of the January 10, 2010 balloon test, please click this link.
5. In its presentation on November 17, 2009, T-Mobile attempted to hide information about alternate sites for its antennas:
  • T-Mobile's representatives avoided answering community members' questions about alternate sites for its antennas.  Yet, T-Mobile is legally obligated under MCPS Policy ECN to "show evidence of pursuit of co-location with other vendors and/or existing facilities."  (Click this link to access MCPS Policy ECN.)
  • T-Mobile's representatives stated that T-Mobile already had antennas installed at two existing alternate sites close to Whitman High School--the water towers at Radnor Road and the cell tower in the Kenwood Club at Goldsboro Road.  Yet, a review of Montgomery County's database reveals that T-Mobile does not have antennas installed at those locations.  (Click this link to access the database.)
  • T-Mobile's representatives also stated that it was technically impossible to install any cell phone antennas on the WDCA Tower, located off of River Road at the Capital Crescent Trail bridge, because, as they said, that was an AM radio tower, and any installation of cell phone antennas on that tower would cause interference with the AM radio antenna.  Yet, in fact multiple cell phone antennas are attached to that tower, as anyone driving down River Road can see, and as the Montgomery County database confirms.  (Click this link to access the database.)
6. In its November 17, 2009 presentation, T-Mobile misrepresented the required county review process in a blatant attempt to lead one to believe that the community is powerless and cannot prevent the installation of the proposed cell tower.  For greater detail on the process, please click this link to access our separate post about this issue.
  • T-Mobile claims that it does not need a special exception. Yet, in this case, T-Mobile must apply for a special exception.
  • T-Mobile claims that MCPS (which has a partial monetary interest in the outcome) has the authority to make the final decision on the application. Yet, it is the independent Board of Appeals (an independent quasi-judicial body) that has the authority to grant or deny the application. 
For further details, please click this link to access our separate post about the process.


    Monday, March 1, 2010

    T-MOBILE DOCUMENTS

    This post contains links to important documents made available by T-Mobile concerning its cell tower proposal:
    • T-Mobile's October 2009 e-mail to the Walt Whitman PTSA describing its proposal (which was originally posted on the school's website but now has been removed) (click this link to access the document)

    • T-Mobile's fact sheet made available at T-Mobile's November 17, 2009 presentation at Walt Whitman High School (click this link to access the document)

    • T-Mobile's site plans showing the location of the proposed tower and equipment on the school grounds, and containing an architectural drawing of the proposed tower (click this link to access the document)

    • T-Mobile's zoning map showing more clearly how the proposed tower location relates to the surrounding homes and neighborhood (click this link to access the document)

    • T-Mobile's RF Emissions Compliance Report containing a calculation of the intensity of radio frequency emissions in relation to the distance from the proposed cell tower (click this link to access the document)

    • T-Mobile's January 4, 2010 letter announcing a balloon test on January 10, 2010 (click this link to access the document)

    • T-Mobile's January 11, 2010 letter inviting to a Community Open House at Walt Whitman High School (now scheduled for February 10, 2010, 7-8:30 p.m.) (click this link to access the document)

    • T-Mobile's January 2010 fact sheet posted on the Whitman PTSA web page on January 23, 2010 (click this link to access the document)

    • T-Mobile's January 2010 comparison with the 2005 Pyle Middle School cell tower proposal, posted on the Whitman PTSA web page on January 29, 2010 (click this link to access the document)

    • T-Mobile's February 23, 2010 letter inviting to a Community Open House at Walt Whitman High School (now scheduled for March 8, 2010, 7-8:30 p.m.) (click this link to access the document)

    • T-Mobile's photosimulations posted on the school's website on February 25, 2010 (click this link to access the document)

    • T-Mobile's chart of 911 calls posted on the school's website on February 25, 2010 (click this link to access the document)




    Sunday, February 7, 2010

    ALTERNATE SITES ON WHITMAN CAMPUS

    Under the Zoning Ordinance, the location of the proposed 120-foot cell tower must satisfy the following two set-back requirements:
    1. It must be 300 feet away from the nearest home and
    2. It must be 120 feet (one foot of set-back for each foot of height) inside the school's property boundary.
    According to T-Mobile's zoning map, the proposed location for its tower satisfies these two set-back requirements.  (Click this link to see T-Mobile's zoning map.)

    We thought it would be interesting to see what other locations within the Whitman campus would satisfy those set-back requirements.  Click this link to view the zoning map with the set-back penciled in.  Any location within the entire area marked in red would satisfy the two set-back requirements.

    We do not know what other locations within this area T-Mobile has considered.

    Wednesday, January 20, 2010

    RELIABLE AND RESPECTED RESOURCES


    American Cancer Society, Cellular Phone Towers:  
    "Cellular phone towers ... are a relatively new technology, and we do not yet have full information on health effects. In particular, not enough time has elapsed to permit epidemiological studies."

    (Click on this link to access the full webpage.)


    LINK TO THE NATIONAL INSTITUTES OF HEALTH 2011 CONTROLLED STUDY CONCERNING CELL PHONE RADIATION



    Balmori, Alfonso, Electromagnetic Pollution from Phone Masts. Effects on Wildlife (2009)

    Scientific article, to be published in Pathophysiology journal, concluding:
    "pulsed telephony microwave radiation can produce effects especially on nervous,
    cardiovascular, immune and reproductive systems:
    - Damage to the nervous system by altering electroencephalogram,changes in neural response or changes of the blood–brain barrier.
    - Disruption of circadian rhythms (sleep–wake) by interfering with the pineal gland and hormonal imbalances.
    - Changes in heart rate and blood pressure.
    - Impairment of health and immunity towards pathogens, weakness, exhaustion, deterioration of plumage and growth problems.
    - Problems in building the nest or impaired fertility, number of eggs, embryonic development, hatching percentage and survival of chickens.
    - Genetic and developmental problems: problems of locomotion, partial albinism and melanism or promotion of tumors.

    In the light of current knowledge there is enough evidence of serious effects from this technology to wildlife. For this reason precautionary measures should be developed, alongside environmental impact assessments prior to installation, and a ban on installation of phone masts in protected natural areas and in places where endangered species are present. Surveys should take place to objectively assess the severity of effects."

    (Click on this link to access the full article.)
    BioInitiative Report: A Rationale for a Biologically-based Public Exposure Standard for Electromagnetic Fields (ELF and RF) (2007)

    Report documenting the scientific evidence on electromagnetic fields:
    "The purpose of this report is to assess scientific evidence on health impacts from
    electromagnetic radiation below current public exposure limits and evaluate what changes in these limits are warranted now to reduce possible public health risks in the future.

    Not everything is known yet about this subject; but what is clear is that the existing public safety standards limiting these radiation levels in nearly every country of the world look to be thousands of times too lenient. Changes are needed.

    New approaches are needed to educate decision-makers and the public about sources of exposure and to find alternatives that do not pose the same level of possible health risks, while there is still time to make changes."
             (Click on this link to access the full report.)
    European Parliament Resolution of 2 April 2009 on Health Concerns Associated with Electromagnetic Fields:
    "Calls for particular consideration of biological effects when assessing the potential health impact of electromagnetic radiation, especially given that some studies have found the most harmful effects at lowest levels; calls for active research to address potential health problems by developing solutions that negate or reduce the pulsating and amplitude modulation of the frequencies used for transmission;
    ...

    Considers that ... it is in the general interest to encourage solutions ... to ensure at least that schools, crèches, retirement homes, and health care institutions are kept clear, within a specific distance determined by scientific criteria, of [GSM antennae]."

    (Click on this link to access the full text of the resolution.)
    Flynn, Angela, Cell Towers and Wireless Communications – Living with Radiofrequency Radiation

    This is a thorough, dependable report summarizing and referencing many additional reliable and respected resources.  (Click on this link to access the report.)

    Hauman, Thomas, et al., HF-Radiation of GSM Cellular Phone Towers in Residential Areas:
    "The GSM technology of wireless communication produces constant pulsed microwave radiationSignificant biological effects result from the non-thermal effects of extremely periodic - pulsed - HF-radiation... Official international and national standards and safety guidelines ... are still only taking into account the risk of thermal effects of high energy HF-radiation.  Most of the official HF public exposure measurements are conducted to observe the percentage of the current standard with only broadband – not frequency selective - measurements. Only in very few cases one or more percent of the (thermal) guideline value is reached or exceeded close to antenna sites. Exposure recommendations based on non-thermal effects are by far lower by many magnitudes. Frequency selective measurements are necessary to observe the cellular base station downlink frequencies and differentiate from other radiation sources as FM radio or TV transmitters. Therefore, very limited information is available on the exposure to cellular base station radiation in residential areas at different distances and directions to antenna sites.

    ...

    As long as the only basis for official standards for high frequency radiation are thermal effects and heating of the body tissue (ICNIRP, ANSI, IEEE, NCRP, FCC, SSK, WHO) there is no need for the industry to invest into less emitting and saver products. More and more scientists state that the view of energy absorption only is insufficient to describe the possible effects on human health. Potential biological effects need to be considered due to

    1.) Non-thermal or low intensity levels of HF radiation,
    2.) Chronic versus acute exposure and,
    3.) Pulsed HF radiation, which is reported to be more bioactive than constant wave RF radiation.
    ...


    From the scientific point of view, adverse human heath effects of non-thermal radiation levels cannot be exactly quantified, verified, or excluded at this time. Only limited toxicological information is available in respect to the widespread use and the economical impact of the cellular phone systems in industrial nations. On one side, there is always a demand for scientific proof for human adverse health effects and dose response when establishing official economically reasonable guideline exposure threshold values. On the other side, insufficient limit of detection, insufficient dosimetry and exposure control, and industry friendly research bias the risk assessment for long-term adverse health effects, especially in the field of the cellular phone industry. That makes it clear - that by definition - official guideline standard values can only limit the consequences of adverse health effects in the frame of the economical impact.
    ...


    We recommend to follow the principle of prevention. This includes implementation of residential exposure minimization and prevention procedures in the frame of the technical feasibility as long as the non-thermal effects are not considered in any official standard and guideline. These will include especially sensitive locations as preschools, schools, hospitals, and residential areas. So far, no other technical aspects than interferences,system coverage and system performance are taken into account. By official definition, the cellular phone system covers an area when the signal strength of about 0.001 μW/m2 is reached. We expect that with little effort, cities, communities, and the providers will be able to significantly reduce the long term radiation exposures to cellular phone towers in residential areas."

    (Click on this link to access the full report.)
    International Association of Firefighters, Division of Occupational Health, Safety and Medicine, Position on the Health Effects from Radio Frequency/Microwave (RF/MW) Radiation in Fire Department Facilities from Base Stations for Antennas and Towers for the Conduction of Cell Phone Transmissions (2005)

    Notes that current RF exposure guidelines "are based on non-continuous exposure;" and expresses concern about the non-thermal biological effects on firefighters "of living directly under ... antenna base stations for a considerable stationary period of time and on a daily basis;" and "oppose[s] the use of fire stations as base stations for towers and/or antennas ... until a study with the highest scientific merit and integrity on health effects of exposure to low-intensity RF/MW radiation is conducted and it is proven that such sitings are not hazardous to the health of [its] members."

    (Click on this link to access the full paper.)

    International Commission on Non-Ionizing Radiation Protection (ICNIRP), Exposure to high frequency electromagnetic fields, biological effects and health consequences (100 kHz-300 GHz) (2009)
    "Although the likelihood is low that fields emanating from base stations would create a health hazard, because of their weakness, this possibility is nevertheless a concern for many people.  To date, no acceptable study on any outcome has been published on this.  ...
    Another gap in the research is children.  No study population to date has included children, with the exception of studies of people living near radio and TV antennas.  Children ... might be particularly susceptible to harmful effects (although there is no evidence of this), and they are likely to accumulate many years of exposure during their lives."

    (Click on this link to access the full report.)
    National Academies of Sciences: Identification of Research Needs Relating to Potential Biological or Adverse Health Effects of Wireless Communication Devices (2008)


    Report concluded that important additional research needs to be done concerning “exposure to juveniles [and] children from … base station antennas” and the effects of radio frequency exposures.

    (Click on this link to access the full report.)

    University of Munich, Ongoing RF Research Studies and Latest Findings Where Available: Children and Adolescents (2009)

    Overview of ongoing studies on health effects on children and adolescents.

    (Click on this link to access the full paper.)

    University of Ottawa, McLaughlin Centre for Population Health Risk Assessment:
    "base stations give rise to whole body exposure 24 hours a day, for those who remain in the neighborhood. More studies of health effects need to be done …."

    (Click on this link to access the full webpage.)
    U.S. Federal Communications Commission (FCC): OET Bulletin 56: Questions and Answers about Biological Effects and Potential Hazards of Radiofrequency Electromagnetic Fields (1999):
    "the possibility of 'non-thermal' biological effects may exist, whether or not such effects might indicate a human health hazard is not presently known. Further research is needed to determine the generality of such effects and their possible relevance, if any, to human health."

    (Click on this link to access the full Bulletin.)
    U.S. FCC: OET Bulletin 65: Evaluating Compliance with FCC Guidelines for Human Exposure to
    Radiofrequency Electromagnetic Fields (1997): explains FCC guidelines

    (Click on this link to access the full Bulletin.)

    U.S. Food and Drug Administration (FDA): Cooperative Research and Development Agreement (CRADA) with the Cellular Communication & Internet Association (CTIA)

    FDA web page pointing to the fact that a large number of studies conducted in the U.S. have been funded by the cell phone industry:
    "FDA’s cooperative research and development agreement (CRADA) with the Cellular Communication & Internet Association (CTIA) has resulted in research projects focused on two topics- mechanistic studies related to genotoxicity and exposure assessment studies. All studies funded through the CRADA have been completed, and no association was found between exposure to radiofrequency (RF) radiation from cell phones and adverse health effects."

    (Click on this link for access to the full webpage.)
    World Health Organization: International Electromagnetic Fields Project: 
    "there are gaps in knowledge still needing to be filled before better health risk assessments can be made on the possible health effects of exposure to many parts of the frequency spectrum."

    (Click on this link for access to the full webpage.)
    LINK TO UPDATED POSITION OF THE W.H.O. CONCERNING CELL PHONE RADIATION

    T-MOBILE MEDIA CAMPAIGN

    Pursuing its own interest, T-Mobile has started a media campaign placing emphasis on the money to be earned from the cellular tower, as well as the need for the tower to improve cell phone reception, while making light of, or outright ignoring, the potential health hazards to students and the surrounding community. Moreover, all the media reports as of the posting of this blog entry have completely ignored the fact that other school communities have successfully argued against having cell phone towers on their school grounds because of the incomplete state of the science surrounding the potential health hazards to children as well as adults due to a 24/7 exposure to cell towers. T-Mobile campaign by "9NEWS NOW" can be seen on:
    http://picasaweb.google.com/googabh/Jan112010_3?feat=directlink. You can also see the full report on: http://www.wusa9.com/news/local/story.aspx?storyid=95703.
    T-Mobile campaign by The Gazette, and the Black and White:
    http://www.gazette.net/stories/01062010/bethnew194202_32557.php and
    http://www.theblackandwhite.net/2009/12/02/proposed-cell-tower-sparks-parent-debate/.
    Concerning the Black and White, below we have reproduced a comment submitted by a neighbor to the online newspaper in response to the above-hyperlinked article. As of the date of this blog entry, that same “comment” has not been published. Because the author of the comment directly addressed the lack of accurate reporting, and because the act of not publishing critical “comments” may or may not be a form of censorship, we decided to reproduce it below so you can decide for yourself whether or not you feel the online newspaper is censoring critical observations about its form of journalism.

    Blogger's Note :
    After the posting of this blog the Black and White decided to post the critical observation we reproduced below.  The makers of this blog applaud the Black and White editors for this decision.



    Link to Pyle resolution

    Link to Wootton decision
     
    2000 dollars is a lot of money, but journalistic accuracy has a lot more worth. First, the T-Mobile presentation was not held during the PTSA meeting, it was held after the meeting had ended. The T-Mobile presentation was held for the benefit of the local and school community. Second, no shouting occurred, except that some people were seriously concerned about the issues and upset that their questions were not being answered. Third, the issue being ignored by T-Mobile representatives was that the science surrounding adverse health effects of radio frequency emissions of cellular towers has yet to be resolved because it takes about 30-40 years for those studies to be completed. In addition, the community articulated two alarming facts (disputed by the T-Mobile representatives): 1. that the World Health Organization (WHO) maintains that "there are gaps in knowledge still needing to be filled before better health risk assessments can be made on the possible health effects of exposure to many parts of the frequency spectrum." http://www.who.int/peh-emf/research/en/, and 2. the FCC maintains "the possibility of 'non-thermal' biological effects may exist, whether or not such effects might indicate a human health hazard is not presently known. Further research is needed to determine the generality of such effects and their possible relevance, if any, to human health." http://www.fcc.gov/Bureaus/Engineering_Technology/Documents/bulletins/oet56/oet56e4.pdf.

    We all know that Wootton High and Pyle Middle School vehemently opposed a cell tower on their school grounds and made similar health arguments to the ones that were made at the November 17 meeting. Because T-Mobile rejected any opposing argument, I decided to research this issue further. What my research revealed was that other very credible authorities have also raised the same concerns, for example: 1. Resulting from a study requested by the U.S. Food and Drug Administration (FDA), a committee of the National Research Council of the National Academies has concluded that important additional research needs to be done concerning “exposure to juveniles [and] children from … base station antennas” and the effects of radio frequency exposures. http://www.nap.edu/catalog/12036.html. 2. In addition, the International Commission for Non-Ionizing Radiation Protection (ICNIRP) concluded that existing studies “have too many deficiencies to rule out an association” between radio frequency exposure and negative health effects. http://www.ncbi.nlm.nih.gov/pmc/articles/PMC1253668/. 3. Likewise, the University of Ottawa’s McLaughlin Centre for Population Health Risk Assessment concluded that “base stations give rise to whole body exposure 24 hours a day, for those who remain in the neighborhood. More studies of health effects need to be done….” http://www.rfcom.ca/primer/bases.shtml. 4. Finally, the American Cancer Society points out that “Cellular phone towers ... are a relatively new technology, and we do not yet have full information on health effects. In particular, not enough time has elapsed to permit epidemiological studies.” http://www.cancer.org/docroot/PED/content/PED_1_3X_Cellular_Phone_Towers.asp?sitearea=PED.--Since paranoia seems to be the assumption, I do indeed hope all these organizations and the principals at Pyle and Wootton are not paranoid ....”

    (sender’s name omitted)


    THE PROCESS: WHAT HAPPENS NEXT?

    T-Mobile representatives, the PTSA leadership, and the press variously have made reference to the process that must be followed before T-Mobile can erect the proposed cell tower. Yet, nobody has offered a clear description of the process, and the community is left in the dark about how it may offer its input and exercise its right to be heard.
    • Quoting an e-mail from T-Mobile, the Whitman High website said that "[t]he Montgomery County Planning Board would need to approve the installation."  (Click this link to access the document.)

    • A fact sheet distributed by T-Mobile at its November 17, 2009 presentation states: "T-Mobile may continue forward with the County process, which includes a technical review by the Montgomery County Tower Review Committee, and thereafter review by M-NCPPC professional staff and Planning Board."  (Click this link to access the fact sheet.)

    • On December 2, 2009, purportedly reporting about T-Mobile's November 17 presentation, The Black and White, Whitman High's school newspaper, said: "[t]he final decision will be subject to the approval of the Montgomery County Tower Review Committee and superintendent Jerry Weast."  (Click this link to access the report.)

    • A January 8, 2010 report on 9News Now stated: "If Whitman's PTSA approves the tower, it would then be up to Superintendent Jerry Weast to sign off on it."  (Click this link to access the report.)
    Here is what we have found out so far about the process (please note that this not legal advice): 

    1. Tower Committee Review and Recommendation

    Under Montgomery County law (click here), a private telecommunications carrier intending to install a cell tower on public school property must first submit an application for review and recommendation by the Telecommunications Transmission Facilities Coordinating Group (Tower Committee). The Tower Committee maintains an informative website (click here), including a description of the coordination process (click here).

    The Tower Committee consists of representatives from various County agencies that own or use public land, and thus may be interested in leasing land to cell phone companies for the installation of cell towers. The current members of the Tower Committee are:

    Margie Williams, Chair (Department of Technology Services-Cable Office)
    Steve Batterden (Department of Public Works and Transportation)
    John Cuff (Office of Management and Budget)
    Carlton Gilbert (Maryland-National Capital Parks and Planning Commission)
    Dave Niblock (Department of Permitting Services)
    Martin Rookard (Washington Suburban Sanitary Commission-Telecom Network Group)
    Mary Pat Wilson (Montgomery County Public Schools-Department of Facilities Management)
    Helen Mu (Department of Technology Services)

    (Click this link for their contact information.)

    Although each County agency retains the right to decide for itself whether or not to go forward with a proposed cell tower lease, the Tower Committee process is intended to ensure a uniform application process, coordinate the siting of cell towers, and coordinate on policy issues.

    Montgomery County also has appointed a Tower Coordinator who receives cell tower applications and coordinates review by the Tower Committee. The Tower Coordinator reviews tower applications for site suitability and checks whether alternative sites exist for a proposed tower, or whether the proposed antennas could be placed on existing towers or other structures (so-called "co-location" options); determines the applicable zoning standards, in particular whether the application is "by right" or requires a "special exception;" and looks into the effect of the proposed tower on the land owning County agency and the potential impacts on the surrounding areas. On this basis, the Tower Coordinator makes a siting recommendation to the Tower Committee for its consideration.

    Upon receipt of the Tower Coordinator's siting recommendation, the Tower Committee discusses the application in a public meeting and issues a recommendation to the Montgomery County Planning Board. The meeting dates (as well as agendas and minutes of previous meetings) are published on the Tower Committee's website. (Click this link for access to the website.)

    According to the database maintained by the Tower Coordinator, T-Mobile submitted its application already in March 2009.  (Click this link for access to the database.)  The County informed us that the application was incomplete, because it lacked required technical information, and for this reason the Tower Coordinator has not yet issued a recommendation. In addition, the County informed us that the Tower Committee would not be addressing T-Mobile's application until after T-Mobile and Montgomery County Public Schools (MCPS) have completed obtaining and evaluating the public's input.

    In its December 7, 2009 e-mail to the Whitman school community, the PTSA leadership emphasized that "The input from the school community is sought at an earlier stage of the process [than several years ago], and is taken very seriously at MCPS. Thus, no decisions have been made about the proposal by any entity, and no decisions will be made until after [the PTSA meeting now scheduled for February 16, 2010]." 

    2. Special Exception or Mandatory Referral?

    Under Section 59-A-6.12(a) and (d) of the Zoning Ordinance, installation of a private telecommunications antenna on publicly owned land requires a special exception unless the antenna is proposed to be "attached to an existing structure owned or operated by a County ... agency."  (Click this link to read the Zoning Ordinance.)

    If a special exception is required, then the Montgomery County Planning Board reviews the application and makes a recommendation to the Board of Appeals. If a special exception is not required, then the Planning Board reviews the application and makes its recommendation to the County agency that owns the land (in this case: MCPS), which then makes the final decision on the application.

    The Tower Committee's website (click here) explains the difference as follows:
    Public Land - Private telecommunications antennas may be attached as a matter of right to an existing structure owned or operated by a county, bi-county, state or federal agency. If a carrier wishes to construct a new privately owned tower or monopole for the exclusive use of private telecommunications carriers on publicly owned land, a special exception is required. If the new tower or monopole will be used by a government agency, the application is submitted to the Planning Board rather than the Board of Appeals and the application goes through a public review process known as Mandatory Referral. Since this process is shorter (60 days maximum) and less costly than the special exception process, there is an incentive for applicants to work with government agencies to identify compatible uses with the government for facilities on public lands.
    In 2007, the Tower Committee considered an application to install a cell tower at Watkins Mill High School that, just like T-Mobile's proposal for Whitman High School, also involved taking down a stadium light pole and erecting a cell tower in its place. Incidentally, T-Mobile then was represented by the same attorney, Sean Hughes, who is now representing T-Mobile in its Whitman High School application.  At its meeting on July 11, 2007, the Tower Committee determined (1) that the cell tower was being built for private use and (2) that the antennas were not being attached to an existing structure because the existing light pole was to be removed.  The Tower Committee concluded that, for these reasons, a special exception, rather than only a mandatory referral, was required.  (Click this link to access the minutes of the Tower Committee's July 11, 2007 meeting.)

    At a recent meeting of the Tower Committee, on April 1, 2009, with T-Mobile's attorney, Sean Hughes, present, an attorney from the County Attorney's Office confirmed:
    ... if a State or County agency wanted to construct a monopole for its own purposes, the proposed monopole would be reviewed through the Mandatory Referral process.  T-Mobile, being a private entity, is subject to the County Zoning Code.  Thus, they could attach to a public agency facility as permitting in 59-A-6.12 of the Zoning Code, but construction of a private use facility on public property would require approval of a Special Exception.  
    (Click this link to access the minutes of the Tower Committee's April 1, 2009 meeting.)

    At T-Mobile's November 17, 2009 presentation at Whitman High School, T-Mobile's attorney, Sean Hughes, said that a special exception was not required for the proposed cell tower. The facts, however, do not support this statement:
    1. Up until the light pole is taken down, it is an "existing structure," however, once the light pole is taken down, it is no longer in existence.
    2. T-Mobile's cell tower is an entirely new structure that will not only contain all the antennas but will also have athletic lights attached to it.
    For these reasons, given the law, a special exception is required here.

    3. Planning Board

    In any event, after the Planning Board receives the application, it is analyzed by the Department of Planning's Technical Staff. As recommended by the Montgomery County People's Counsel (click here), this is an opportunity for members of the public to voice their concerns and opinions. You may do so by contacting the lead reviewer or the zoning analyst assigned to the application, by writing them a letter, and/or by scheduling a meeting with them. Doing so will ensure that the Technical Staff will consider the public's views in preparing its Technical Staff Report to the Planning Board.

    Upon receipt of the Technical Staff Report, the Planning Board will schedule a public hearing on the application. It posts the Technical Staff Report on its website approximately 10 days before the hearing. The hearing presents a formal opportunity for the public to present written and/or oral testimony. Note that there are strict time limits for oral testimony at the hearing.

    Under the Mandatory Referral Process, the Planning Board then issues a recommendation to the land owning County agency, which then decides finally on the application.

    If a special exception is required (and we believe it is in this case), the Planning Board's recommendation and the Technical Staff Report are then forwarded to the Office of Zoning and Administrative Hearings for a second public hearing before a Hearing Examiner. As described by the People's Counsel (click here), this hearing has no time limits; it involves witness testimony and cross-examination; and the participants may submit exhibits. After the hearing, the Hearing Examiner prepares a Report and Recommendations for the Board of Appeals.

    4. Board of Appeals
     
    Upon receipt of the Hearing Examiner's Report and Recommendations, the Board of Appeals holds a public work session at which it discusses the Hearing Examiner's Report and votes on the application. The Board of Appeals may also decide to request further information from the Hearing Examiner. The Board of Appeals may grant parties of record the opportunity to present oral argument on the basis of the Hearing Examiner's Report. 

    5. Department of Permitting Services


    T-Mobile's application requires a building permit regardless of whether the application goes through the Mandatory Referral or special exception process.